Diff Between development Length and Lapping lenth
Development length (Ld)
“ The embeded
length in concrete is called development length”
The minimum length
of steel bars necessary on either side of section to develope bond is
called as development length "
formula for finding
Ld from IS Code
As per IS
456-2000Clause:26.2.1
For LSM
Development length= (0.87 fy Ø)/(4τbd)
Ø= nominal diameter of the bar, fy : grade of steel
τbd = design bond stress given in 2.6.2.1.1.
Note – For Hysd
steel bars increase values by 60%
How Much Ld provided
beam and slab –
48d
Column – 60d
Overlapping length
“The lap of bar needed ti transfer stresses to onther bars
ie means the available size of steel bars in market is 12 meter , if we have maximum span in beam , column and slab etc then we have to use two bars . That is required suffiecient length for transfering of stresses from one bar to onther is called lapping length
lapping length
beams and slab- 60d
columns – 45d